Client: XYZ Packaging Plant (Food & Beverage)
Project: Packaging Line Re-Layout & Material-Flow Optimization
Scope: Current high-touch secondary packaging operation has chronic downtime and operator bottlenecks.
Goal: Reduce walk distances, improve visibility to line, and prepare for future case-packer integration.
Deliverables
1. Current-State Layout & Walk-Path Mapping
2. Two Concept Options
3. Refinement Pass
4. Hand-Off Package
Timeline
This investment positions your detailed engineering for faster execution and fewer iterations, typically saving $5,000–$15,000+ in stamped-engineering revision cycles.
Click the Button below to receive Full details in a downloadable pricing sheet (PDF).
Copyright © 2026 Draft Hive Co - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.